Based on the timeline of events outlined by Karpatkey, it would have been best to give notice at the end of February, when the issue was first recognized. I would consider the BIP shortly after a public notice, but with limited reach. At this point, I would still consider this forum to be the best place to alert LPs in case there is any issue. This is what will be done going forward.
In general, I would advise transparently communicating oracle configurations for RWA pools from the very beginning, as they are the most critical part of the pool infrastructure. This should help LPs to rationalise what potential pitfalls are. KPK and Gnosis will do their best to prevent this in the future, but I am also grateful to the community for providing critical feedback and keeping an eye on it.
For now, for LPs, that were impacted, additional incentives are made available as outlined in the GIP.